During our mid-March melt we experienced an incredible amount of melt water in a short period of time. The 4th fairway received a high volume of surface runoff from the adjacent field in which unfortunately created some subsurface erosion across the fairway. We will be addressing this repair project as soon as the fairway is firm enough to begin.
The project will entail:
- edging out and pulling up the sod
- filling in the eroded trenches
- packing the area and resodding with fairway bentgrass
We will continue to post our progress.
No comments:
Post a Comment